Intro
Mavenlink provides software and services for advanced project management, task collaboration, resource allocation, work management and professional services automation. To learn more about the Mavenlink API, visit their page (http://developer.mavenlink.com/).
You connect to your Mavenlink account in the Data Center. This topic discusses the fields and menus that are specific to the Mavenlink connector user interface. General information for adding DataSets, setting update schedules, and editing DataSet information is discussed in Adding a DataSet Using a Data Connector.
Prerequisites
To connect to your Mavenlink account and create a DataSet, you must have a Mavenlink username and password.
Connecting to Your Mavenlink Account
This section enumerates the options in the Credentials and Details panes in the Mavenlink Connector page. The components of the other panes in this page, Scheduling and Name & Describe Your DataSet, are universal across most connector types and are discussed in greater length in Adding a DataSet Using a Data Connector.
Credentials Pane
The Domo Mavenlink connector uses OAuth to connect, so there is no need to enter credentials within Domo. Click Connect (or select Add Account if you have existing Mavenlink accounts in Domo) to open the Mavenlink OAuth screen where you can enter your Mavenlink credentials. Once you have entered valid Mavenlink credentials, you can use the same account any time you go to create a new Mavenlink DataSet. You can manage connector accounts in the Accounts tab in the Data Center. For more information about this tab, see Managing User Accounts for Connectors.
Once you have entered valid Mavenlink credentials, you can use the same account any time you go to create a new Mavenlink DataSet. You can manage connector accounts in the Accounts tab in the Data Center. For more information about this tab, see Managing User Accounts for Connectors.
Details Pane
This pane contains a primary Reports menu, along with various other menus which may or may not appear depending on the report type you select.
Menu |
Description |
||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Report |
Select the Mavenlink report you want to run. The following reports are available:
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Show Archived Stories |
Select whether you want your report to include archived stories. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Include Archived Workspaces |
Select whether you want your report to include archived workspaces. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Show Deleted Stories |
Select whether you want your report to include deleted stories. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Subject Type |
Select whether you want to retrieve data about stories, workspaces, or users. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date Type |
Select whether you want to pull data for a specific date or a date range. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date |
Select whether the report data is for a specific date or for a relative number of days back from today. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date Picker |
Select the date for the report. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date Offset |
Enter the number of past days that should appear in the report. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date From |
Specify whether the first date in your date range is a specific or relative date. You select the last date in your range in Date To. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date To |
Specify whether the second date in your date range is a specific or relative date. You select the first date in your range in Date From. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date From Picker |
Select the first date in your date range. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date To Picker |
Select the second date in your date range. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date From Offset |
Enter the number of the farthest day back that should be represented in the report. Combine with Date To Offset to create a range of represented days. For example, if you entered 10 for Date From Offset and 5 for Date To Offset, the report would contain data for 10 days ago up until 5 days ago. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Date To Offset |
Enter the number of the most recent day back that should be represented in the report. Combine with Date From Offset to create a range of represented days. For example, if you entered 10 for Date From Offset and 5 for Date To Offset, the report would contain data for 10 days ago up until 5 days ago. |
Other Panes
For information about the remaining sections of the connector interface, including how to configure scheduling, retry, and update options, see Adding a DataSet Using a Data Connector.
Comments
0 comments
Please sign in to leave a comment.